Home | Trajectory | Industry | Unilever Colombia SCC S.A.S.

INDUSTRY

UNILEVER COLOMBIA SCC S.A.S

Project Name:
Electromechanical Assembly Charlotte Process and Packaging Project HPC

Project Description:
Mechanical assembly of process equipment, electrical assembly of panels, MCC, fiber optics and communication, instrumentation and control, pipelines, and accessories.

Representative Quantities of the Project:
38 Tons of Steel Structure.
290 Equipment.
15,000 Inches of Diameter (CS and SS).
9,000 meters of Electrical Conduits (Trays and Conduit).
32,000 meters of Power Cable.
47,000 meters of Instrumentation Cable.
900 Instruments.

  • Palmira (Valle del Cauca) – Colombia
  • Duration: 9 months
  • Man-hours: 95,000

BETTER PEOPLE,

BETTER SOLUTIONS

Our people are our most valuable and important resource, they give all their energy and dedication that is visible every day overcoming challenges, creating innovative solutions and building strong relationships with each other and our customers.

 

More about us

CLIENTS