Home | Trajectory | Infrastructure | Impala Terminals

INFRASTRUCTURE

IMPALA TERMINALS BARRANCABERMEJA S.A.

Project Name:
Barrancabermeja Terminal

Project Description:
Assembly of pumping equipment, pumping station, and main water distribution network for the fire protection system, supply and assembly of poles, masts, and luminaires.

  • Barrancabermeja, Colombia
  • Duration: 14 months
  • Man-hours: 37,000

BETTER PEOPLE,

BETTER SOLUTIONS

Our people are our most valuable and important resource, they give all their energy and dedication that is visible every day overcoming challenges, creating innovative solutions and building strong relationships with each other and our customers.

 

More about us

CLIENTS