Project Name:
Electromechanical assembly of elements 6, 7, 8, Marine Works (Without quadrant beams) and remaining works in Puerto Bolívar.

Project Description:
Electromechanical assembly of conveyor belt BC 508, BC 509, transfer tower TS 59, TS 60, sampling station, and marine works in Puerto Bolívar – Cerrejón.

Representative Quantities of the Project:
1.100 meters of 2,400mm & 2,100mm Conveyor Belt (On-Shore and Off-Shore), 1 Sampling Station, and 2 Transfer Towers.
Water Services and Firefighting Pipes.
1,300 Tons of Structure.
660 Tons of Equipment.
5,000 meters of Pipes.
4,000 meters of Cable Trays.
77,000 meters of Low and Medium Voltage Cables and Control Cables.

  • Puerto Bolívar (La Guajira) – Colombia
  • Duration: 7 months
  • Man-hours: 390,000